Page 17 - Chief Executive Report - July 2022
P. 17

PARKS & SPECIAL PROJECTS  PARKS & SPECIAL PROJECTS



        South East Greenway                                   Woodstock Gardens
        Construction: Lots 1 – 3 are almost complete          Early summer in the gardens has been
        with approx. 8km of Greenway surfaced with            busy. The Rose garden, terraces and Walled
        seating and fencing installed from Rosbercon to  gardens have been the focus of much of the
        Ballyverneen, Glenmore.                               attention with topiary planting needing pruning
                                                              to maintain the formal shapes typical of the
        The construction compound located at                  Winter Garden. Also underway is the replanting
        Ferrybank has been reinstated & restored with         of the walled garden herbaceous border
        all stone & construction materials removed.           and the removal of the box hedging which
        A number of bridges were sand blasted and             is unfortunately infested with box blight like
        painted and the replacement of tie rods was           so many box plants (Buxus sempervirens) in
        completed to one of the jack arch bridges.
                                                              formal gardens all around Europe. New planting
        Design & Tender: Final review of the detailed         of herbaceous plants typical of the Victorian era
        design and tender documents is nearing                will be planted to refresh the planting scheme
        completion for Lot 5a (Ferrybank to Luffany),
        in advance of advertising for tender. Works are
        also progressing on the preparation of detailed
        design and tender documents for Lot 5b
        (Luffany to Aylwardstown), Lot 6 (Glenmore to
        Aylwardstown) and Lot 4 (New Ross to Mount
        Elliott).

        Landowner agreements on the accommodation
        works for Lots 4 – 7 continues to move forward.
        Works at Lots 1-3 are nearing substantial
        completion.
        Links to Slieverue and Glenmore from                  Aerial view of the Walled Garden, the herbaceous
 Outdoor Kilkenny Social Media interaction May & June 2022  South East Greenway  border follows the central axial path through the
        On foot of the initial landowner and public           gardens connecting the Arboretum to the Flower
        engagement evenings on the emerging routes            Terrace
        to connect both villages to the Greenway,             The Tea Rooms
        the preferred route for each village was              The tea room was open seven days a week
        confirmed. A presentation of the route selection      throughout the month of June offering a variety
        process and preferred route was given at the          of gorgeous cakes and good coffee. Visitors can
        Piltown Municipal District June meeting. The          enjoy a cuppa in the beautiful surroundings and
        Appropriate Assessment Screening for each             enjoy the outdoor terrace when the sun shines.
        preferred route will commence shortly.                The Woodstock coffee truck, located near
        Parks & Playgrounds                                   the carpark and tented picnic area, was also
        Tender documents are being prepared for a             serving refreshments throughout the weekends
        number of playground and amenity projects             in June and from mid-July our offering will
        around the County. The Parks Department are           increase to include fresh ice cream cones, 99’s
        assisting the local community of Freshford with       etc. with the completion of our new eagerly
        the preparation of tender documents for the           awaited ice cream parlour
 Trail restoration / enhancement – Noble Fir Avenue and Monkey Puzzle Avenue, Woodstock  development of an outdoor activity hub, which
        includes a children’s playground adjacent to
        the GAA pitch in the village. Funding has been
        approved under the Town and Village Renewal
        Scheme and Community & Cultural Facilities
        Capital Scheme. The scheme will provide an
        access road, car parking and outdoor activity
        equipment including play equipment aimed at
        children. The local community also intend to
 16     develop a sensory garden at the site also.                                                         17
   12   13   14   15   16   17   18   19   20   21   22